BML battery monitor manual
TBB POWER CO., LTD.
Operation
First power on
1.
Confirm the connections are correct as the manual guided and fastened.
2.
Connect Cable-Starter-Batt- Volt/01and Cable-BM/03.
3.
Connect Cable-Service-Batt-Volt/01 and Cable-BM/03.
BML is powered on after the above steps.
4. Initial settings for BML.
a)
Set battery type and capacity.
b)
Set System datetime and installation datetime.
c)
Battery capacity correction. Use a proper battery charger to charge the battery until
there is no alarms on the BML display.
d)
Any change of the battery type or battery capacity setting needs a repeat for step b)
and c)
DO NOT plug out any connectors on the BML during it is working.
Power Off
a)
I
f there is starter battery connected, disconnect the cable connect with the
starter battery first, then disconnect the cable connected to the service
battery,Cable-Service-Batt-Volt/01 and Cable-BM/03 to complete the shut down
of BML.
b)
If there is no starter battery connected, disconnect disconnect the cable
connected to the service battery, Cable-Service-Batt-Volt/01 and Cable-BM/03 to
complete the shut down of BML.