6-4
OPERATING PROCEDURES
Model 490
Operating Procedures
6
Figure 6-13
Note: The draw valve bracket must be positioned
with the notch to the left.
15. Lay the air tube in the bottom of the mix hopper.
Figure 6-14
16. Slide the center drip pan into the hole in the front
panel.
Figure 6-15
17. Install the front drip tray and splash shield under the
door spout.
Figure 6-16
Sanitizing
1. Prepare an approved 100 PPM sanitizing solution
(examples: 2-1/2 gal. [9.5 L] of Kay-5
®
or 2 gal.
[7.6 L] of Stera-Sheen
®
).
Important! Use warm water and follow the
manufacturer's specifications.
2. Pour the sanitizing solution into the hopper and allow
it to flow into the freezing cylinder.
Figure 6-17
3. Open the prime plug on the door.
101108
12254
10092
10093
12029
Summary of Contents for 490
Page 16: ...4 4 OPERATOR PARTS IDENTIFICATION Model 490 Operator Parts Identification 4 Notes...
Page 18: ...5 2 USER INTERFACE Model 490 User Interface 5 Notes...
Page 32: ...9 2 PARTS REPLACEMENT SCHEDULE Model 490 Parts Replacement Schedule 9 Notes...
Page 38: ...11 4 LIMITED WARRANTY ON PARTS Model 490 Limited Warranty on Parts 11 Notes...