14
HFT
Step 2:
Assembly of the Upright Frames and the Top Frames
1. Slide the pulley height adjusters (15R & 16L) onto the upright frames (2R & 3L).
2. Attach the upright frames (2R & 3L) to the base frame legs (1R & 1L) with the four pre-installed
3/8” chromed washers (62) and 3/8” chromed nylon nuts (68).
࣑
ATTENTION
Make sure to thread the hex bolts (49) from the bottom into the heigth adjusters (15R & 16L) in
the following step.
3. Attach two rotating pulley holders (17) to the right & left pulley height adjusters (15R & 16L)
with two 1/2” X 4-1/4” hex bolts (49), four 1/2” washers (61) and two 1/2” nylon nuts (67).
4. Attach the top frames (6R & 7L) to the rear upright frames (4) with two 3/8” X 4” black hex bolts
(51), four 3/8” black washers (63) and two 3/8” black nylon nuts (68).
5. Attach the top frames (6R & 7L) to the upright frames (2R & 3L) along with the chin bar (7) and
two pulleys (36) with four 3/8” X 4-1/4” black hex bolts (50), eight 3/8” black washers (63) and
four 3/8” black nylon nuts (68).
6. Tighten all bolts starting from the bottom.
Summary of Contents for BodyCraft SEBR6245
Page 2: ...2 HFT ...
Page 11: ...11 ...
Page 13: ...13 ...
Page 15: ...15 ...
Page 17: ...17 ...
Page 19: ...19 ...
Page 34: ...34 HFT Notes ...
Page 35: ...35 ...
Page 36: ...Functional Trainer HFT ...