
Installation Guide: PowerAire® Quad
r2.0-7/8/14
Quad- S: 16943, 17351 Quad- M: 16886, 16633 Quad- C: 17347, 17348
7510 Montevideo Road
© 2012 Tate Access Floors, Inc.
Jessup, MD 20794
Tel (410)799-4200
9 of 15
9.
The unit can now be powered on by plugging it into (figure 14,15) the appropriate power outlet outline in
table 1. Once power is applied, and the power switch is turn on, (figure 16) the unit will begin the startup
procedure. This process is completed when the user display shows the current peak temperature.
Figure 14- Connecting power to the unit
Figure 15 - Plugging the power cord into the unit
Figure 16 – Location of Power Switch