14
ASSEMBLY
14. Assemble 5/8” x 4” hex bolt and 2-1/4” spacer.
15. Attach the PTO Shield to the A-Arm plates
using 1/4” x 3/4” hex bolt.
16. Fully tighten all bolts.
17. Install the PTO guard using four (4) 1/2” x 3/4”
bolts and washers. Make sure the opening on the
PTO guard is on the top.
18. Install PTO driveline.
19. Remove bolt from the PTO shaft. Slide the PTO
shaft onto the gearbox and reinstall the bolt through
the opening in the PTO shaft guard.
20. Assembly of your Rotary Tiller is now complete.
Please read the next section of this manual for filling
gearboxes with oil and lubricating instructions.