
T4100 OM rev2
Page 50 of 50
All interior doors, drawers, hatch boards, operated and planed down if necessary after rigging
is tensioned. A certain degree of swelling is to be anticipated. (Not warranty, part of
commissioning)
Check that all interior lights are operational.
Check the hoist on all sails and ensure correct halyard lengths as well as freedom of
movement of halyards, etc. Check and adjust operation of reefing system.
After Shakedown Sail:
Re-tension all rigging if necessary.
If excess headstay sag is apparent, use next lower hole in link plates or tension backstay.
DEALER:_________________________________________________________
OWNER:__________________________________________________________
BOAT MODEL ___________________HULL NUMBER___________________
DATE OF COMMISSIONING_________________________________________
Dealer Signature________________ Date_______
Owner Signature ______________Date_______
Tartan Yachts Signature_____________________ Date __________
Summary of Contents for 4100
Page 11: ......
Page 12: ......
Page 13: ...6 0 W L...
Page 47: ...T4100 OM rev2 Page 43 of 50 Tartan Yachts Commissioning Checklist...