
T4100 OM rev2
Page 16 of 50
Recommended Maintenance Schedule
Page (2)
UPON
DELIVERY
(By Dealer)
AFTER
SHAKEDOWN
CRUISE
AT EACH USE
EVERY (6) SIX
MONTHS
EVERY (12)
TWELVE
MONTHS
ENGINE (CONTINUED)
Change engine oil. (See
engine manual for complete
engine schedule)
X
Clean and lubricate the
(optional) Saildrive folding
propeller
X
Inspect Saildrive blades, pins,
and fasteners.
X
X
Inspect Zincs.
X
X
Spray all electrical connections
with
WD 40 or similar lubricant.
X
Change Saildrive oil (see
engine manual)
X
Check Saildrive rubber seal for
cracks or wear
X
X
PLUMBING SYSTEMS
Clean out bilge and sump
debris strainer.
X
X
Clean out water system debris
strainer.
X
X
X
Inspect all fittings for leaks.
X
X
X
Lubricate Head
X
Lubricate sea cocks
X
STEERING SYSTEMS
Inspect stuffing box
X
X
Lubricate Nylon bearings with
WD40
X
Inspect bolt assemblies for
tightness and lubrication. Oil
bearing areas, check
adjustment of quadrant, grease
mating areas, oil support
bearings on seat face, oil shaft
bearings on each side of pinion
gear.
(Rack and Pinion System)
X
X
ELECTRICAL
Inspect all navigation lights for
operation.
X
X
Inspect Batteries/charger for
correct operation.
X
X
Note: See all of the installed parts manuals for additional maintenance procedures.
Summary of Contents for 4100
Page 11: ......
Page 12: ......
Page 13: ...6 0 W L...
Page 47: ...T4100 OM rev2 Page 43 of 50 Tartan Yachts Commissioning Checklist...