
T4000 OM
To Be Done Prior to Turning Vessel Over to Owner:
þ
Clean entire deck, including removing excess bedding compound from around
fittings, which may continue to ooze for a short time after shipment.
þ
Check for deck leaks caused by shipping. NOTE: all boats are thoroughly checked
prior to shipment, but fittings can loosen under shipment and handling.
þ
Touch up exterior teak finish if applicable.
þ
Inspect and tighten engine shifter and throttle controls as needed.
þ
Fill water tank(s) and check operation of water system for leaks as well as the
hot water if included.
þ
Check head operation, holding tank and macerator pump. Operate bilge pump(s).
NOTE: if auto pump is installed, adjust switch level and ensure the auto switch is not
blocked by bilge hoses. Operate sump pump, shower and drain collection, and on
some models sinks.
þ
Check operation of all running lights.
þ
All fluid levels in engine are to be checked after test run.
þ
All gauges should be operational.
þ
Operate galley stove and oven (every burner).
þ
Adjust lifelines so they are taut.
þ
Remove all traces of shipping tape.
þ
Operate all winches and lubricate if necessary.
þ
Check operation of all thru-‐hull fittings.
þ
Operate all hatches and ensure that no binding occurs.
þ
All interior doors, drawers, hatch boards, operated and planed down if necessary
after rigging is tensioned. A certain degree of swelling is to be anticipated. (This is
not a warranty issue, part of commissioning)
þ
Check that all interior lights are operational.
Summary of Contents for 4000
Page 14: ......
Page 16: ......
Page 17: ......
Page 19: ......
Page 20: ......
Page 22: ...TAPPAN TM7050S MICROWAVE...
Page 23: ......
Page 61: ...T4000 OM Tartan Yachts Commissioning Checklist...
Page 74: ...Owner Registration 18 Additional comments THANK YOU FROM TARTAN YACHTS tartan reg_ques doc...
Page 80: ...Owner Registration 18 Additional comments THANK YOU FROM TARTAN YACHTS tartan reg_ques doc...