Fill water tank(s) and check operation of water system for leaks as well as the hot water if included.
ü
Check head operation, holding tank and macerator pump. Operate bilge pump(s). NOTE: if auto pump is
installed, adjust switch level and ensure the auto switch is not blocked by bilge hoses. Operate sump
pump, shower and drain collection, and on some models sinks.
ü
Check operation of all running lights.
ü
All fluid levels in engine are to be checked after test run.
ü
All gauges should be operational.
ü
Operate galley stove and oven (every burner).
ü
Adjust lifelines so they are taut.
ü
Remove all traces of shipping tape.
ü
Operate all winches and lubricate if necessary.
ü
Check operation of all thru-hull fittings.
ü
Operate all hatches and ensure that no binding occurs.
ü
All interior doors, drawers, hatch boards, operated and planed down if necessary after rigging is
tensioned. A certain degree of swelling is to be anticipated. (This is not a warranty issue, part of
commissioning)
ü
Check that all interior lights are operational.
ü
Check the hoist on all sails and ensure correct halyard lengths as well as freedom of movement of
halyards, etc. Check and adjust operation of reefing system.
After Shakedown Sail:
ü
Re-tension all rigging if necessary. Check steering cables if applicable
ü
If excess headstay sag is apparent adjust the headstay and/or backstay tension as required
ü
Check steering cables if applicable
Again, this manual is intended to help you to know your new Tartan Yacht. It is most important to familiarize
yourself thoroughly with all aspects of operating and maintaining your yacht in a safe and efficient manner.
Read your manual carefully as well as the booklets supplied by the manufacturers of the components. If any
questions arise for which you can’t find an answer, your Tartan dealer will be pleased to help you.
It is Company policy that the Tartan line of yachts is continually upgraded and improved. Therefore, you may
find your yacht equipped with gear different from that shown in your manual. Any new piece of equipment will
be in all cases equal to or better than, its predecessor.
Summary of Contents for 3700
Page 12: ...T3700 H AR KE N U S A R...
Page 13: ......
Page 14: ...DECK LAYOUT Spinnaker Gear...
Page 15: ...DECK LAYOUT Vang and Spinnaker Gear...
Page 16: ...ACCOMMODATION PLAN...
Page 20: ...1 BATTERY WIRING SCHEMATIC...
Page 22: ...PROPANE LEAK DETECTOR...
Page 24: ...AIR CONDITIONER LAYOUT Single Unit...
Page 25: ...THRU HULL LAYOUT...
Page 26: ...TANKAGE...
Page 30: ...CCR RIG WITH REACHER 12 4 07 TJ...
Page 31: ...Stability Curve...
Page 65: ...TartTarta Tartan Yachts Commissioning Checklist...