![Tarm Biomass SOLO INNOVA 30 Installation And Operation Manual Download Page 36](http://html.mh-extra.com/html/tarm-biomass/solo-innova-30/solo-innova-30_installation-and-operation-manual_819831036.webp)
Solo Innova Instructions 1-800-782-9927 Version 01-18
Tarm Biomass · 4 Britton Lane · Lyme, NH 03768
3.4.10 Electrical Connections
Electrical connections to the boiler are made to the boiler on block X4 in the large electrical junction
box located on the rear of the boiler
(Fig. 3.6).
See the connection diagram in
section 6.4.3.
L1 and L2
are the two “hot” legs and the third leg is the ground wire
(Fig. 3.7).
The boiler requires a dedicated
240V 60 hertz 15 amp circuit. Check local codes for wire type and size. Shielded cable is usually re-
quired. All wires should be fastened to the junction box using the proper connectors. The boiler’s cir-
culator pump (120 Volt) is connected to Terminals 9, 10 and 11 on Block X4 using the same guide-
lines above.
Boiler Installation & Start-up > Connections to the Boiler
Page 32
Fig. 3.6
Fig. 3.7
X4 Power Connections
Circulator Connections
*Please refer to Section 6.4.5
Junction Box
Fan Connections
The white wire connects to
(L),
the red wire connects
to
(N),
and the ground wire connects to the fan’s
grounding screw
(Fig. 3.9)
.
Incoming Power
Circulator Power
L1
G
L2
N
L1
G
N
Fig. 3.8
Fig. 3.9