General Instructions
Installation: Stanchion Unit
1. Shut off water supply and drain
lines. Prepare (2) two ½” IPS (Iron
Pipe Size) nipples extending 6”[15cm]
above the floor, roughed into con-
crete. Apply Teflon Tape or pipe joint
compound to threads.
6”[15cm]
floor
nipple
2”
[5cm]
2. Screw no.
5
onto floor nipples.
Be sure
to install with arrows pointing up.
Apply
Teflon Tape or pipe joint compound to
threaded ends.
4. Screw no.
9
into each no.
5
with
running threads up.
5. Remove no.
10
from top of no.
9
.
6. Slide no.
1
cover over assembly
and put no.
6
(or no
.
7
or no
.
8
) in
place to make certain no.
9
is centered
thru holes in no.
6
.
3. Unscrew
flange caps
from bottom
end of no.
9
. Apply Teflon Tape or
pipe joint compound to threads of
no.
9
.
7. Mark floor for no.
1
drilling locations
while no.
1
,
no.
2
and no.
6
is on
.
8. Remove no.
1
,
no.
2
and no.
6
and drill
(3) three 7/8"[2 cm] Ø holes into floor,
2-1/2"[6 cm] deep. Insert no.
3
.
9. Replace no.
1
and no.
2
without
no
.
6
.
Screw (2) two no.
10
’s down on each
no.
9
. Adjust each pair of no.
10
’s so
they are flush with the top of no.
2
and
jammed together.
10. Place no.
6
over no.
2
. Attach
flange caps
to no.
6
and tighten.
3
9
5
4
1 0
f l a n g e
cap
f l a n g e
cap
9
6
9
1 0
Item no.
4
to be attached to floor
only after final test for leaks has
been completed.