General Instructions
10. Insert no.
29
through bottom hole
of no.
6
, screw on no.
28
at top of
no.
6
, place no.
27
onto no.
28
. No.
26
goes onto no.
27
, then screw no.
25
onto no.
29
and tighten. Position
no.
27
as desired. Tighten no.
30
as
needed.
26
30
25
27
28
29
Installation: Kettle Kaddy
Assembly
11. Remove (no.
3
) yoke from no.
1
valves by unscrewing each
coupling
nut
from the yoke.
Note: Hook and bolt installation
will be similar on other units.
Note: Use item numbers from
B-0182 exploded view.
Other models are similar.
12. Apply Teflon Tape or pipe joint
compound to threads of no.
9
. Place
no.
1
onto no.
9
as far as it will go.
6
coupling
nut
5
3
9
1
1
13. Remove
spindle assembly
from
the second no.
1
, screw valve onto
other no.
9
.
1
spindle
assembly
14. Replace
spindle assembly
onto
no.
1
body.
15. Replace no.
3
on both no.
1
couplings and tighten with a wrench.
16. Attach no.
7
to no.
6
.
17. Attach no.
21
to no.
5
.
7
21
5
6
3
1
18. Turn on
water and check
for leaks.
Installation: Hook and Bolt
Assembly