
7
3.5.3
Test Procedure
45
3.6
Using the Control Unit as a Dual Contact Timer
45
3.6.1
Timer Mode
45
3.6.2
Connections
45
3.6.3
Test Procedure
45
3.7
CT Polarity
46
3.7.1
Modes & Settings
46
3.7.2
Connections
46
3.7.3
Test Procedure
46
3.8
CT Ratio
47
3.8.1
Modes & Settings
47
3.8.2
Connections
47
3.8.3
Test Procedure
47
4
MAINTENANCE
49
4.1
Output Control Brushes
49
4.2
Removal of the CU-Ps from Case
49
5
STANDARD ACCESSORIES
51
5.1
Spare Fuses Supplied
51
5.2
Standard Accessories Supplied
51
5.3
Optional Accessories Supplied
51
6
OVERALL PERFORMANCE SPECIFICATION
53
6.1
Insulation Resistance at 1000V DC
53
6.2
Applied Voltage Test
53
6.3
Accuracy of Instruments
53
6.3.1
Loading Unit Current Output
53
6.3.2
Secondary Injection Current Output
54
6.3.3
Auxiliary Metering Input
54
6.3.4
Timing System
54