![background image](http://html1.mh-extra.com/html/tandc/tc30/tc30_instructions-for-intallation_3069393006.webp)
BASE LOG #1
PIN HOLE
PIN HOLE
PINS
TOP RIGHT LOG #2
PIN
STOP TAB
Fig #8
Fig #9
Fig #10
Fig #11
Fig #12
The logs are packaged in a foam pack inside the box. They are
fragile and should be handled with care. Unpack and inspect log
set. There should be a total of 7 logs. Gas plumbing and vent con-
nections should be completed before proceeding.
Position the logs as indicated by the following pictures. The three
main logs have holes and /or pins. Engage each pin in the cor-
responding holes. The remaining logs do not have holes or pins.
They rest in position. Locate as per the diagrams.
(Figs. #8 – #18)
6
TC30.NG01.C 140708
Log Set Assembly
Summary of Contents for TC30
Page 2: ...2 TC30 ng01 C 140708 Notes...
Page 14: ...14 TC30 ng01 C 140708 Notes...
Page 15: ...15 TC30 ng01 C 140708 Notes...