background image

12.    Replace the minimum rate screw with the 

one provided in the propane conversion 
kit supplied with this fireplace. Ensure 
that the screw is fully installed. 

 

(Fig. #29)

13.     Pull off the rubber cap from the top of 

the pressure regulator. (Fig. #30) 

14.  Press down on the center post and  
 

rotate 90°. The center post should  

 

stay down. (Fig. #31). Replace the 

 

rubber cap.

15.     Fill  in  the  date  and  the  name  of  the 

person who performed the conversion in 
the white area on the conversion label. 
Peel off the protective backing and apply 
the  conversion  label  directly  over  the 
gas specifications on the rating label.

16.     Attach the access panel to the side of 

the firebox with the previously removed 
screws. (Fig. #32)

Note: 
Gasket  must  be  installed  with  access 
panel.

Minimum
rate screw

NG

LP

Fig #29

Fig #30

Fig #31

Fig #32

10

TC30.NG01.C 140708

Summary of Contents for TC30

Page 1: ...s are supplementary to the Installation and Operating Instructions supplied with the fireplace and should be kept together Refer to the Installation and Operating Instructions for proper gas supply sa...

Page 2: ...2 TC30 ng01 C 140708 Notes...

Page 3: ...lk head fitting and tighten Fig 2 Ensure that there are no leaks NOTE Primary air shutter must be fully closed for Natural gas or fully open for Propane BURNER ASSEMBLY EMBER MATERIAL 7 PCS LOG SET HA...

Page 4: ...3 Attach the pilot supply tube to the bulk head fitting and tighten Fig 3 Ensure there are no leaks 4 Connect spark electrode wire ORANGE to the rear electrical bulk head fitting Connect the flame sen...

Page 5: ...ers until level with the top of the pan at rear and gradually slope forward to the firebox floor at the front covering both burner tubes 3 Place remaining ember material outside of the burner pan as d...

Page 6: ...inspect log set There should be a total of 7 logs Gas plumbing and vent con nections should be completed before proceeding Position the logs as indicated by the following pictures The three main logs...

Page 7: ...PIN HOLE TOP LEFT LOG 3 BOTTOM RHS CHUNK 4 BOTTOM CENTER CHUNK 5 BOTTOM LHS CHUNK 6 CENTER CHUNK 7 Fig 13 Fig 15 Fig 14 Fig 16 Fig 17 Fig 18 7 TC30 ng01 C 140708...

Page 8: ...enchremovethenaturalgas orifice 32 and replace with propane orifice 48 our part 5021 3407 Fig 22 WARNING This conversion kit shall be installed by a qualified service agency in accordance with the man...

Page 9: ...fold and air deflector 8 Witha7 16 wrenchloosenthepilothead on the pilot assembly by a half turn Fig 25 9 Slide the pilot adjustment band over and ensure that the hole in the orifice band is showing F...

Page 10: ...should stay down Fig 31 Replace the rubber cap 15 Fill in the date and the name of the personwhoperformedtheconversionin the white area on the conversion label Peelofftheprotectivebackingandapply the...

Page 11: ...be required to ensure a gas tight connection Correct gas pressure requirement Supply Pressure Natural Gas Propane Min Pressure 5 0 WC 12 5 WC For purpose of input adjustment Max Pressure 13 9 WC 13 9...

Page 12: ...w 5 Rotate the shutter to increase or decrease the amount of primary air 6 Reassemble in reverse order The air shutter on the burner tube controls the primary combustion air to the gas burner and is p...

Page 13: ...TUBE CONNECTION 1h PILOT BRACKET 1i HEAT SHIELD 1j HEAT SHIELD INSULATION 2a BASE LOG 2b TOP LEFT LOG 2c TOP RIGHT LOG 2d CENTER CHUNK 2e BOTTOM LHS CHUNK KIT CONTENTS 2f BOTTOM CENTER CHUNK 2g BOTTOM...

Page 14: ...14 TC30 ng01 C 140708 Notes...

Page 15: ...15 TC30 ng01 C 140708 Notes...

Page 16: ...Printed in Canada Technical support 1 877 715 2664 Web site www townandcountryfireplaces net 2975 Allenby Rd Duncan BC V9L 6V8...

Reviews: