Z-Block Manual version 1.3
Page 8
Tamas Hydronic Systems
Applications
CLIENT:
Date
Checked:
Drawan:
Fernando
Tom
Tom
19/004/2017
19/04/2017
19/04/2017
Size
B
DWG.
No.
Scale:
Rev.
1
2
Sheet 1 of 1
Boiler Pump
Approvals
Approved:
Proprietary Information:
The information contained in this document is the property of Thamas hydronic Systems
Inc. except as specifically authorized in writing Tamas Hydronic Systems Inc. The holder
document:
(1) Shall keep all information contained herein confidential and shall protect same in
whole or in part from disclosure and dissemination to all third parties.
(2) Shall use same for operation and maintenance purposes only.
Applications
The Tamas Z-Block is designed to be assembled and installed in multiple
configurations and orientations.
1) Boiler Pump
As a boiler pump in a multiple zone application. You must use optional part
#025-0005 180° End Connection for creating primary/secondary piping
arrangement. See page 9 for Z-Block inverted pump configuration.
Zone Pumps
Boiler Pump
with 180° End
Connector