
TM5-4120-375-14
SECTION V.
ORGANIZATIONAL MAINTENANCE PROCEDURES
4-13.
GENERAL INSTRUCTIONS.
Most maintenance instructions in this section will list
resources required, personnel required and equipment for
the start of the procedure.
NOTE
Resources required are not listed unless they apply to the
procedure.
Personnel required are listed only if the task requires more
than one.
If PERSONNEL is not listed, it means one person can
do the task.
The normal standard equipment condition to start a maintenance
task is air conditioner stopped and control switch OFF.
EQUIPMENT CONDITION is not listed unless some other condition
is required besides the power being
OFF.
Summary of Contents for UAC40-5/6-08
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 61: ...table D 1 table D 1 table D 1 table D 1 TM5 4120 375 14 4 27...
Page 77: ...TM5 4120 375 14 4 43 4 17...
Page 79: ...4 45 TM5 4120 375 14 4 18...
Page 81: ...TM5 4120 375 14 4 47 4 19...
Page 89: ...TM5 4120 375 14 a b c d e 4 55...
Page 91: ...TM5 4120 375 14 Change 1 4 5 7...
Page 137: ...4 103 TM5 4120 375 14...
Page 199: ...5 31 TM5 4120 375 14 table D 1...
Page 253: ...TM5 4120 375 14 5 85...
Page 285: ...TM5 4120 375 14 5 117...
Page 308: ......
Page 312: ......
Page 314: ...PIN 054090 001...
Page 324: ......
Page 331: ...TM 5 4120 375 14 Change3 E 3...
Page 332: ...TM 5 4120 375 14 Pin 0 5 4 0 9 0 0 0 3 E 4 U S GOVERNMENT PRINTING OFFICE 1995 655 121 20084...
Page 334: ......
Page 340: ......
Page 342: ......
Page 343: ......
Page 344: ......
Page 345: ......
Page 346: ......
Page 347: ......
Page 348: ......
Page 349: ......
Page 350: ......
Page 351: ......
Page 352: ......