
3-2
OPERATION
BEFORE STARTING
OPERATION
GETTING ON OR OFF THE MACHINE
• Do not jump on or down from the
machine. Never attempt to get on or off
the moving machine.
BEFORE STARTING OPERATION
• Climb up/down the steps holding the
handrail to support your weight in a
three point secure stance (hand and
feet).
• Never use the safety lock lever or
control levers as hand holds.
WALK-AROUND INSPECTION
Perform the walk-around inspections once a
day before starting the engine for the first
time that day.
Refer to “MAINTENANCE, Walk-around
inspection”, on pages 5-14 and 5-15.
DAILY INSPECTION
Perform the daily inspections once a day
before starting the engine for the first time.
Refer to “MAINTENANCE, Daily inspection”,
on pages 5-16 to 5-21.
Summary of Contents for TB215R
Page 10: ...0 8 ...
Page 11: ...1 1 SAFETY SAFETY ...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Page 48: ...1 38 ...
Page 49: ...2 1 CONTROLS ...
Page 77: ...3 1 OPERATION ...
Page 107: ...4 1 TRANSPORT ...
Page 112: ...4 6 ...
Page 113: ...5 1 MAINTENANCE ...
Page 149: ...5 37 MEMO ...
Page 169: ...6 1 TROUBLESHOOTING ...
Page 183: ...7 1 SPECIFICATIONS ...
Page 185: ...7 3 MEMO ...
Page 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Page 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Page 190: ...7 8 MEMO ...
Page 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Page 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Page 194: ...7 12 ...
Page 195: ...8 1 OPTIONS ...
Page 203: ...8 9 ...