![Takeuchi TB215R Operator'S Manual Download Page 138](http://html1.mh-extra.com/html/takeuchi/tb215r/tb215r_operators-manual_814676138.webp)
5-26
MAINTENANCE
EVERY 50 HOURS
EVERY 50 HOURS
INSPECTING AND ADJUSTING THE
CRAWLER TENSION
• If you must work beneath the raised
machine or working equipment, always
use wood blocks, jack-stands or other
rigid and stable supports. Never get
under the machine or working
equipment if they are not sufficiently
supported. This procedure is especially
important when working on hydraulic
cylinders.
• Be careful with the high-pressure grease
In the track adjuster, the grease has
been injected under high pressure. If the
tension is adjusted without following the
prescribed procedure, the grease
discharge valve may fly off, resulting in
injury.
· Never loosen the grease fitting.
· Loosen the grease discharge valve
slowly. Do not turn it more than one
turns.
· Do not put your face, arms, legs or
body in front of the grease discharge
valve.
· If grease does not come out when the
grease discharge valve is loosened,
the valve is faulty. Ask a Takeuchi
service agent for repair.
2. Use the working equipment to lift the
machine body. Operate the levers slowly.
3. Inspect the gap between the bottom
surface of the frame at the center of the
crawler frame and the top surface of the
crawler.
The gap must be within the following
range:
Inspection
1. For rubber crawlers, move the machine so
that the “M” or “∞” mark at the joint is at
the top center of the crawler frame.
AD6G013
Summary of Contents for TB215R
Page 10: ...0 8 ...
Page 11: ...1 1 SAFETY SAFETY ...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Page 48: ...1 38 ...
Page 49: ...2 1 CONTROLS ...
Page 77: ...3 1 OPERATION ...
Page 107: ...4 1 TRANSPORT ...
Page 112: ...4 6 ...
Page 113: ...5 1 MAINTENANCE ...
Page 149: ...5 37 MEMO ...
Page 169: ...6 1 TROUBLESHOOTING ...
Page 183: ...7 1 SPECIFICATIONS ...
Page 185: ...7 3 MEMO ...
Page 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Page 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Page 190: ...7 8 MEMO ...
Page 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Page 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Page 194: ...7 12 ...
Page 195: ...8 1 OPTIONS ...
Page 203: ...8 9 ...