![background image](http://html1.mh-extra.com/html/takeuchi/tb215r/tb215r_operators-manual_814676154.webp)
5-42
MAINTENANCE
REPLACING THE AIR CLEANER ELEMENT
Stop the engine and allow the machine to
cool down before performing
maintenance.
• The engine, muffler, radiator and many
other parts of the machine are hot
immediately after the engine is stopped.
Touching these parts will cause burns.
IMPORTANT: Do not use an element if its
pleats, gaskets or seals are damaged.
IMPORTANT: Be sure to install the
element and dust cap securely. If not,
dust could be drain into the cylinder,
damaging the engine.
1. Open the maintenance cover A.
2. Loosen the clamps (1) and remove the
dust cup (2).
3. Clean the inside of the dust cup (2).
5. Cover the intake hole at the back of the
body (4) with cloth or tape to prevent dirt
from getting in.
<If equipped with the secondary element>
Do not yet remove the secondary element
(5).
6. Clean the inside of the body (4).
7. Remove the cloth or tape applied in step
5.
<If equipped with the secondary element>
Remove the secondary element (5).
8. Install the new elements.
9. Install the dust cup (2) with its “ TOP ”
mark facing up, and then fasten it with the
clamps (1).
10. Push the button (3) on the dust indicator
to reset the red piston (2).
EVERY 1000 HOURS
4. Remove the primary element (3).
Summary of Contents for TB215R
Page 10: ...0 8 ...
Page 11: ...1 1 SAFETY SAFETY ...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS ...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS No 00085 01011 ...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS ...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS ...
Page 48: ...1 38 ...
Page 49: ...2 1 CONTROLS ...
Page 77: ...3 1 OPERATION ...
Page 107: ...4 1 TRANSPORT ...
Page 112: ...4 6 ...
Page 113: ...5 1 MAINTENANCE ...
Page 149: ...5 37 MEMO ...
Page 169: ...6 1 TROUBLESHOOTING ...
Page 183: ...7 1 SPECIFICATIONS ...
Page 185: ...7 3 MEMO ...
Page 186: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS ...
Page 188: ...7 6 SPECIFICATIONS OPERATING RANGES ...
Page 190: ...7 8 MEMO ...
Page 192: ...7 10 SPECIFICATIONS LIFTING CAPACITIES ...
Page 193: ...7 11 SPECIFICATIONS LIFTING CAPACITIES ...
Page 194: ...7 12 ...
Page 195: ...8 1 OPTIONS ...
Page 203: ...8 9 ...