![background image](http://html1.mh-extra.com/html/takeuchi/tb128fr/tb128fr_operators-manual_3336580125.webp)
5-9
MAINTENANCE
LIST OF TIGHTENING TORQUES
Nuts and Bolts (for ISO strength category 10.9)
Tighten nuts and bolts at the torques shown on the table below, unless otherwise specified.
• The tightening torques used for the mounted plastic covers are not listed in the table below.
Consult your sales or service dealer for details. They will be damaged if over tightened.
• When replacing nuts and bolts, replace them with nuts and bolts of the same size and
standards.
• Tighten nuts and bolts alternately (top, bottom, left then right) or in 2 or 3 times so that they
are evenly tightened.
Classification
Head width (b)
Size (a) x pitch
Tightening torque
General connection points
mm
mm
N·m
ft-lb
Coarse
10
M6 x 1.0
9.8±0.5
7.2±0.4
12, 13
M8 x 1.25
22.6±1.1
16.6±0.8
14, 17
M10 x 1.5
47.1±2.4
34.7±1.7
17, 19
M12 x 1.75
83.4±4.1
61.5±3.0
19, 22
M14 x 2.0
134.4±6.7
99.1±4.9
22, 24
M16 x 2.0
207.9±10.4
153.3±7.7
27, 30
M20 x 2.5
410.9±20.5
303.1±15.1
Fine
12, 13
M8 x 1.0
24.5±1.2
18.1±0.9
14, 17
M10 x 1.25
50±2.5
36.9±1.8
17, 19
M12 x 1.5
87.3±4.3
64.4±3.2
19, 22
M14 x 1.5
135.3±6.8
99.8±5.0
22, 24
M16 x 1.5
220.6±11
162.7±8.1
27, 30
M20 x 1.5
452.1±22.6
333.4±16.6
SERVICE DATA
AG7G009
Summary of Contents for TB128FR
Page 1: ...C 1...
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS...
Page 47: ...2 1 CONTROLS...
Page 79: ...3 1 OPERATION...
Page 89: ...3 11 MEMO...
Page 111: ...4 1 TRANSPORT...
Page 115: ...4 5 TRANSPORT HOISTING THE MACHINE Three point suspension...
Page 117: ...5 1 MAINTENANCE...
Page 172: ...5 56...
Page 173: ...6 1 TROUBLESHOOTING...
Page 186: ...6 14...
Page 187: ...7 1 SPECIFICATIONS...
Page 189: ...7 3 MEMO...
Page 190: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS Canopy MACHINE DIMENSIONS...
Page 192: ...7 6 SPECIFICATIONS Cab MACHINE DIMENSIONS...
Page 194: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 196: ...7 10 MEMO...
Page 198: ...7 12 SPECIFICATIONS Standard arm LIFTING CAPACITIES...
Page 199: ...7 13 SPECIFICATIONS Standard arm LIFTING CAPACITIES...
Page 200: ...7 14...
Page 201: ...8 1 OPTIONS...