![background image](http://html1.mh-extra.com/html/takeuchi/tb128fr/tb128fr_operators-manual_3336580066.webp)
2-20
CONTROLS
OPERATING LEVERS
WARNING
• Before starting operation, carefully
check which lever pattern you are going
to use.
• It is described using the ISO pattern in
this manual.
Use these levers to operate the boom, arm,
bucket and upperstructure.
Refer to “Lever pattern” on page 3-6.
Refer to “Operating the working equipment”
on page 3-18.
LEVERS AND PEDALS
BLADE LEVER
Use this lever to operate the dozer blade.
(A) .......Blade up
(B) ......Blade down
Refer to “Operating the dozer blade” on
page 3-19.
Summary of Contents for TB128FR
Page 1: ...C 1...
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS...
Page 47: ...2 1 CONTROLS...
Page 79: ...3 1 OPERATION...
Page 89: ...3 11 MEMO...
Page 111: ...4 1 TRANSPORT...
Page 115: ...4 5 TRANSPORT HOISTING THE MACHINE Three point suspension...
Page 117: ...5 1 MAINTENANCE...
Page 172: ...5 56...
Page 173: ...6 1 TROUBLESHOOTING...
Page 186: ...6 14...
Page 187: ...7 1 SPECIFICATIONS...
Page 189: ...7 3 MEMO...
Page 190: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS Canopy MACHINE DIMENSIONS...
Page 192: ...7 6 SPECIFICATIONS Cab MACHINE DIMENSIONS...
Page 194: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 196: ...7 10 MEMO...
Page 198: ...7 12 SPECIFICATIONS Standard arm LIFTING CAPACITIES...
Page 199: ...7 13 SPECIFICATIONS Standard arm LIFTING CAPACITIES...
Page 200: ...7 14...
Page 201: ...8 1 OPTIONS...