5-33
MAINTENANCE
7. Clean the primary element (3) with dried
compressed air (294 to 490 kPa or 43 to
71 psi).
First blow the air from the inside of the
element along the pleats. Then blow the
air from the outside and finally from the
inside again.
8. Light up the inside of the primary element
(3) with a light bulb, inspect it, and replace
it if there are small holes or thin spots.
9. Remove the cloth or tape applied in step
5.
10. Install the primary element (3).
11. Install the dust cup (2) with its
“ TOP ” mark facing up or by
aligning the arrows “ / ”, and then
fasten it with the clamps (1).
EVERY 250 HOURS
Summary of Contents for TB128FR
Page 1: ...C 1...
Page 10: ...0 8...
Page 11: ...1 1 SAFETY...
Page 44: ...1 34 SAFETY SAFETY SIGNS DECALS...
Page 45: ...1 35 SAFETY SAFETY SIGNS DECALS...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS...
Page 47: ...2 1 CONTROLS...
Page 79: ...3 1 OPERATION...
Page 89: ...3 11 MEMO...
Page 111: ...4 1 TRANSPORT...
Page 115: ...4 5 TRANSPORT HOISTING THE MACHINE Three point suspension...
Page 117: ...5 1 MAINTENANCE...
Page 172: ...5 56...
Page 173: ...6 1 TROUBLESHOOTING...
Page 186: ...6 14...
Page 187: ...7 1 SPECIFICATIONS...
Page 189: ...7 3 MEMO...
Page 190: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS Canopy MACHINE DIMENSIONS...
Page 192: ...7 6 SPECIFICATIONS Cab MACHINE DIMENSIONS...
Page 194: ...7 8 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 196: ...7 10 MEMO...
Page 198: ...7 12 SPECIFICATIONS Standard arm LIFTING CAPACITIES...
Page 199: ...7 13 SPECIFICATIONS Standard arm LIFTING CAPACITIES...
Page 200: ...7 14...
Page 201: ...8 1 OPTIONS...