65
OPERATION
Machine Operation
Left Crawler Forward
Left Crawler Reverse
Boom Lower
Boom Raise
Upperstructure Slew Left
Upperstructure Slew Right
Boom Swing Left
Boom Swing Right
Right Crawler Forward
Right Crawler Reverse
Arm Out
Arm In
Bucket Load
Bucket Dump
Dozer Blade Lower
Dozer Blade Raise
Lever Pattern (JCB Pattern)
WARNING
¡
¡
¡
¡
¡
Be careful to check which pattern of lever control arrangement you are operating
with before beginning operations.
¡
¡
¡
¡
¡
The explanations in this manual are for the ISO pattern.
C4D013
〈〈〈〈〈
JCB
〉〉〉〉〉
Summary of Contents for TB125
Page 6: ...4 ...
Page 8: ...6 ...
Page 89: ...87 TRANSPORT Loading and Unloading 88 Securing the Machine 89 Cautions on Transporting 90 ...
Page 148: ...146 ...
Page 153: ...151 MEMO ...
Page 166: ...164 MEMO ...
Page 194: ...192 ...
Page 205: ...203 MEMO ...
Page 253: ...251 MEMO ...
Page 258: ...256 ...
Page 259: ...257 INDEX ...