
3
MACHINE DESCRIPTlON
■
Front, rear, Ieft and right
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the dozer blade
visible to the front.
■
Designated operations
Use this machine primarily for the following
operations:
¡
Excavating
¡
Digging ditches
¡
Digging side ditches
¡
Leveling
¡
Loading
■
Features
¡
Short pitch rubber crawler
¡
Low engine noise and exhaust emissions
¡
Electro over hydraulic control of auxiliary hydraulic circuit is located on the left-hand joystick
control
¡
One touch engine deceleration button is located on the right-hand joystick control
¡
Slew cushioning system for easy bucket positioning
¡
Engine emergency stop/idle system
¡
Tilt-up operators platform for easy access to major compartment
■
Break-in period
When the machine is new, heed the instructions below when operating the machine for the
first 100 hours (as indicated on the hour meter).
Using a new machine roughly without breaking it in will lead to quicker deterioration of machine
performance and may shorten the machine’s service life.
¡
Warm up the engine and hydraulic oil sufficiently.
¡
Avoid heavy loads and rapid operations. Operate with a load of about 80% the maximum
load.
¡
Do not start up, accelerate, change directions, or stop abruptly unless necessary.
E3A020
FRONT
LEFT
RIGHT
REAR
Dozer blade
Summary of Contents for TB125
Page 6: ...4 ...
Page 8: ...6 ...
Page 89: ...87 TRANSPORT Loading and Unloading 88 Securing the Machine 89 Cautions on Transporting 90 ...
Page 148: ...146 ...
Page 153: ...151 MEMO ...
Page 166: ...164 MEMO ...
Page 194: ...192 ...
Page 205: ...203 MEMO ...
Page 253: ...251 MEMO ...
Page 258: ...256 ...
Page 259: ...257 INDEX ...