●Floor Surface of Tile or Glass Finish
The tiles or glass of the floor surface will break when the bolts are embedded during installation of the shampoo unit. If this is
the case, the installation area should be finished with materials such as plywood or mortar.
(1) Peel off the inner tiles or glass along the outside lines of the installation area of the floor. The work must be done carefully;
otherwise, the peeled portion may be obvious.
(2) Place composite panels in the peeled-off area. The panel surface should be higher than the surrounding tile or glass surface
(within 2 or 3 mm).
(3) Caulk gaps between the composite panels and the finished surface.
● Fixing the BB Bracket to floor.
*If a BB Bracket will be used, the fixing points to floor will differ from P.14. (The sub-floor base measurement is the same).
Please refer the above diagram when installing BB Bracket.
Base cover
Bae
Plywood
Applied caulking
Tile or glass
260
214
90
45
165
Outer line of BB Bracket
Water 1/2” (ID. 12.7/OD. 13.5mm)
Hot water 1/2” (ID.12.7/OD.13.5mm)
Drainage VU40 (ID.40/OD.48mm)
334
435.5
15