1-14
Changing procedure of the frame
From cap frame to tubular goods frame
1.
Detaching of cap frame unit
1.
Loosen the screws (1) and (2) to detach the cap frame unit (3).
2.
Attaching of tubular goods frame sash
1.
Fix the tubular goods frame sash (1) using the attaching screw (2).
3
1
2
1
2
1
2
KY01
Summary of Contents for TEJT II -C
Page 2: ......
Page 26: ...1 22 Changing procedure of the frame ...
Page 27: ...2 Set the frame 1 Cap frame p 2 2 2 Tubular goods frame p 2 5 ...
Page 32: ...2 6 Set the frame ...