Y-6
Y-6
Assembly Adjustment (Crane Operation)
62
WY05-4112E
2.8 Slide plate adjustment at the side of the
boom head (outer box)
(Section [8])
Base boom
Extend the inner box fully. In that state, adjust the
shims so that the inner box is aligned to the
center of the outer box. The clearance between
the slide plate and the outer box shall be as
minimum clearance (0.5 mm (0.2 in) or less).
Telescopic section 1 to Telescopic section 4
Extend the inner box fully. In that state adjust the
shims so that the inner box is aligned to the
center of the outer box. The clearance between
the slide plate and the outer box shall be as
minimum clearance (0.5 mm (0.2 in) or less).
Then tighten the fitting bolt.
Apply a thread locking agent (ThreeBond 1401 or
the equivalent) to the bolt.
△
0
342-022-70070
Summary of Contents for GR-1600XL
Page 1: ......
Page 8: ...7 WA04 5330E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z ...
Page 28: ...14 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Page 30: ...16 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...
Page 33: ...19 WY02 2020E Y 2 Y 2 Adjusting Pressure Hydraulic Pressure ...