Operation
S4600-ST®
37
“START meas.” will start the leakage rate measurement with the
settling phase and after the set time the pressure measurement will
start. A counter in the main display shows the duration of the running
measurement in seconds and minutes.
The start and the end of the pressure measurent is signalled
acoustically.
The measured values are held in the main display; you can print
save, or show the measurement log as QR code.