3. Chose supply air temperature (see user and maintenance instructions, "Operation").
4. Chose operation time for filter
(fig. 12)
. Standard factory setting is 9 months. This is sufficient in areas
where the outdoor air has a satisfactory quality. If the outdoor air is polluted by exhaust from traffic,
industry etc, filter change every 6 months is recommended. Even if the outdoor air quality is good, and
the fresh air filter is not clogged, maximum recommended operation time for filters is 12 months
(Smells and organic pollution will reduce the supply air quality). To increase or reduce the operation
time for filters, press buttons (13) and (9) or (13) and (10) simultaneously. Setting is confirmed by
flashing light in lamp (14) and constant light in:
- Lamp (6) for 6 months operation time between changing filter
- Lamp (7) for 9 months operation time between changing filter
- Lamp (8) for 12 months operation time between changing filter
Additional accessories
For more information about silencers,
diffusers/louvers, roof units, wall grilles etc. see technical catalogue
and installation respective instructions.
Summary of Contents for VR 250 ECH/B
Page 1: ...10 04 17 09 2010 VR 250 ECH B Air Handling Unit Installation description GB GB...
Page 15: ...10 04 2010 09 17 VR 250 ECH B Luftbehandlingsaggregat Installationsbeskrivning GB SE...
Page 29: ...10 04 17 09 2010 VR 250 ECH B Ventilasjonsaggregat Montasjeanvisning NO...
Page 43: ...10 04 17 09 2010 VR 250 ECH B L ftungsger t Installationsanweisung DE...