13 – 1
m
ainTenanCe
reporT
13
©
IT
4000
9.4000.04
1148
13 m
ainTenanCe
reporT
1
To be filled in by customer service
(S = Total, L = prolonged salting process, N = normal regeneration,
M = shortened salting process)
2
Position 2
3
Position 3
4
Position 5
The values for suction time, waste water, flushing and primary filtrate apply to each
regeneration step
Date of installation:
Mains pressure:
Date:
Raw water hardness -
measured [°dH]:
set [°dH]:
Hardness of blended
water - measured
[°dH]:
Water meter [m
3
]:
Number of reg.
1
S
L
N
M
Suction time
2
[minu-
tes] (max. 15 min.)
Waste water
[litres] (max. 4.5 litres)
Flushing
3
(3 - 4.5
litres)
Primary filtrate
4
(2.5 -
4 litres)