Page | 9
To allow for unattended UPS shutdown/start-up and status monitoring, connect
the communication cable one end to the USB/RS-232 port and the other to the
communication port of your PC. With the monitoring software installed, you can
schedule UPS shutdown/start-up and monitor UPS status through PC.
The UPS is equipped with intelligent slot perfect for either SNMP or AS400 card.
When installing either SNMP or AS400 card in the UPS, it will provide advanced
communication and monitoring options.
Step 4: Network connection
Network (IN)
Fax
Phone surge port (OUT)
Connect a single modem/phone/fax line into surge-protected “IN” outlet on the
back panel of the UPS unit. Connect from “OUT” outlet to the equipment
with
another modem/fax/phone line cable.
Step 5: Disable and enable EPO function
This UPS is equipped with EPO function. By default, the UPS is delivered from
factory with
PIN 1 and PIN 2 closed
(a metal plate is connected to
PIN 1 and
PIN 2
) for UPS normal operation. To activate EPO function, remove two screws
on EPO port and metal plate will be removed.
Step 6: Turn on the UPS
Press the
ON/Mute button
on the front panel for two seconds to power on the
UPS.
NOTE:
The battery charges fully during the first five hours of normal operation.
Do not
expect full battery run capability during this initial charge period.
Summary of Contents for Contender 1 KVA
Page 14: ...Page 12 Battery Kit 3 Units Battery Kit 4 Units...
Page 15: ...Page 13 Battery Kit 6 Units...
Page 31: ......