14
Fig. 5
(4)
4'' x 4
'' x 35
-1/2''
(6)
2'' lag screws
(3 each Cup-Loc)
(3)
2-1/2''
screws/nails
A. Frame Construction (cont.)
7.
Secure upper 2'' x 4'' and lower 5/4''
boards to
Frame 2
as shown in
(Fig. 5)
.
Edges are to be flush with 4’’ x 4’’s.
2'' Lag screw
(4)
2-1/2'' screws/nails
(1)
Lag Screw
x 3
Double check to make
sure structure is square
A. Frame Construction (cont.)
8.
Install 4'' x 4'' beams as shown in
(Fig. 6)
.
9.
Install lag screws at each corner location as
shown in
(Fig. 6a)
Fig. 6
Fig. 6a
4'' x 4'' x 47-1/2''
4'' x 4'' x 47-1/2''
4'' x 4'' x 35-1/2''
4'' x 4'' x 35-1/2''
Frame
2
Frame 1
Meijer.com
Summary of Contents for Alpine 611
Page 7: ...7 ALPINE Meijer com ...