PREPARATIONS AND OPERATING CONDITION
For your own safety, as protection for others, and to avoid damage to the equipment, read carefully this manual
and operating guidelines.
1. Before working, be sure that the hose joint sleeve nut is properly fastened to the drive unit. Note! The
drive unit must be switched off during this handling and check the correct working of all handling and safety
devices.
Always use two ways extension cables equipped with two connector plugs in the male and in the female plugs.
Male plug is assembled in the motor.
Note! Do not use damaged or worn out cables.
2. Screw the poker on the screwed end of the transmission up to fasten with spanner (left threaded).
3. Do not make sharp bends on the flexible shaft during operation
4. Do not over lubricate the inner flexible shaft.
5. Do not keep working the poker out of the concrete more than 5 minutes.
6. Do not restrict the movement of the poker during the work.
7. Do not stop the poker inside the concrete.
8. Change the wear parts to avoid damage to the internal parts. (Check wearing table for the poker)
9. Do the maintenance with the types and quantities of recommended lubricants.
10. Use ear protection according the safety instruction.
POKER CONNECTION TO THE FLEXIBLE SHAFT: (POSITION 2 ABOVE).
The flexible shafts PVS are intended to connect to the pokers PVM.
The model PVS 25 due to the diameter need, have a special transmission PVM 1-32, 2-32, 3-32 and 4-32.