Section III: Operation
3.0.OPE.SL-212
CHANGING HOOK HEIGHT:
54” to 36” Jib Height Adjustment Procedure
CAUTION:
THE FOLLOWING IS THE RECOMMENDED PROCEDURE FOR CHANGING HOOK HEIGHTS ON THE
ADJUSTABLE JIB FROM 54” TO 36” HEIGHTS. FAILURE TO FOLLOW AND ADHERE TO THIS
PROCEDURE MAY RESULT IN POSSIBLE PROPERTY DAMAGE AND/OR PERSONAL INJURY.
MAKE SURE WORK AREA IS CLEAR OF PEOPLE AND OBSTACLES PRIOR TO CHANGING THE
HOOK HEIGHT ON THE ADJUSTABLE JIB.
STEP 1.
With the telescopic arm in full load/unload position (as shown); remove the hitch pin from the lock
pin. Then pull the lock pin loose from the jib arm.
STEP 2.
Tilt the telescopic arm toward the cab (left control lever forward).
STEP 3.
Extend the jib toward the cab (right control lever forward).
3-6
Summary of Contents for SL-212
Page 2: ......
Page 4: ......
Page 6: ......
Page 45: ...Section II Installation Accessories 2 7 INS ACC LEDLB 2 27 ...
Page 56: ......
Page 66: ......
Page 78: ......
Page 86: ......
Page 87: ......
Page 88: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 FAX 515 313 4426 ...