Monitoring Station SV 279 PRO
27
10. The station now is ready for use.
3.6. Switching on the station
When the remote communication is installed and the station is fully assembled:
Turn on the SVAN 979 instrument. The controller will turn on automatically.
System integration is checked directly after turning on the controller. This procedure
includes checking the connections with the instrument, the 3G modem (optionally
also the SP 274 meteo module). Additionally, system power and internal
temperature of the station and the battery state are checked.
During the checking procedure, all diodes are red and steady. All errors are
indicated on the front panel by appropriate LED indicators. If all red indicators turn
off after above procedure, then the station is ready to use.