![Suzuki kq750 2008 Service Manual Download Page 399](http://html.mh-extra.com/html/suzuki/kq750-2008/kq750-2008_service-manual_1408822399.webp)
Transfer: 3C-5
• Install the transfer output shaft assembly and reverse
idle gear. Refer to “Transfer Components (Page 3C-
2)”.
• Install the gearshift fork (2) and reverse gearshift fork
(3).
NOTE
Identify the shape of the shift forks and
install them properly.
• Install the gearshift cam (4).
• With engaging each fork and to the cam groove, insert
the fork shaft (5).
• Assemble the engine. Refer to “Engine Bottom Side
Assembly in Section 1D (Page 1D-51)”.
• Remount engine assembly. Refer to “Engine
Assembly Installation in Section 1D (Page 1D-16)”
and “Engine Top Side Assembly in Section 1D
(Page 1D-21)”.
2
3
I831G1330016-01
2
3
I831G1330017-01
4
I831G1330018-01
5
I831G1330019-01
Summary of Contents for kq750 2008
Page 2: ......
Page 4: ......
Page 55: ...Maintenance and Lubrication 0B 28 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Page 66: ...0C 11 Service Data ...
Page 308: ...1K 5 Exhaust System ...
Page 480: ...4D 6 Parking Brake ...
Page 526: ...6B 13 Steering Handlebar ...
Page 574: ......
Page 575: ......
Page 576: ...Prepared by October 2007 Part No 99500 47020 03E Printed in U S A 576 ...