Hayabusa-Zone.com
Bikeland.org
- 4/12-
INSPECT ROUTING
1. Remove the upper and lower meter panels (refer to Service Manual page 9D-15).
2. Check if the ignition switch lead wire is clamped and routed correctly. Incorrect positions
are shown in Figures 1 and 2. Correct routing and clamping is shown in Figures 3 and 4
on page 5.
Figure 1
Incorrect
Position
Incorrect Gray Tape
Position
Gray tape is not
visible on both
sides of clamp
-or-
Gray tape is not
positioned beneath
clamp
Figure 2
Incorrect
Routing
Incorrect Routing
Ignition switch harness
is routed behind the
right switch harness.
Cowling
Brace
Side
§
§
§
§
§
90
0
90
0
90
0
Ignition Switch
Lead Wire
=