Mr
S
team CU Series
Installation, Operating & Maintenance Manual
Control Circuit Wiring Diagram
10
F1 Plus Temperature Control System and optional automatic blowdown assembly
For Models: CU-1000AB3, CU-1000AC3, CU-1250AB3, CU-1250AC3, CU-1400AB3, CU-1400AC3
L E G E N D
Factory Wiring
Field Wiring
120VAC Input
L N GND
2nd CU-HL
R
B
W
CU-HL
R
B
W
Remove Jumper
for CU-HL
High Probe
6" PUR
Rod
Low
9" Probe RED
Rod
High No Rod
PINK
Water
Probe
GRN/YEL
Top of Pressure Vessel
High Limit
Operating
Pressure Control
Pressure Control
WHT
Ground
WHT
BLK
Steam
Solenoid
Valve
S
Remove
Jumper for
Optional Timer
BLK
WHT
YEL YEL
ON/OFF Switch
BLK
BR
BLK
YEL
WHT
WHT
WHT
GRN/YEL
Contactor Contactor
GRN/YEL
WHT
Remove
BR
BLK
Jumper for
AutoFlush
Timer
Pilot Light
RED
BLK
PUR
RED
BLU
Motorized
Blowdown
Valve (CU81600)
WHT
BLU
Automatic
RED
Blowdownc
GRN/YEL
(optional)
S
WHT
BLU
Blowdown
GRN/YEL
Valve
(CU81500)
BLK
BLK
FILL
HTR
YEL
H
L L1
BLK
C L2
GRN/YEL
WHT
Low High Com
NO NC COM Input
WHT
YEL
YEL
GRN BLK
L1 L2
LLCO G
NC
COM
Reset NO
Manual Reset
Auxiliary Low Water Cutoff (optional)
Sensor
F1 Plus
Temperature Controller
F1 Plus
Kit
2nd Steam
Solenoid
Valve
Remove
Jumper for
S
2nd Optional
Timer
S
Water Feed
Solenoid Valve
Remove
Jumper for
AUX LWCO
Sensor
F1 Plus
Temperature Controller
Side
Probe
2nd F1
Plus Kit
WHT
BLK
BRN
WHT
WHT
BLK
BRN
WHT