PREPARATION
16
© 2018 Rodan Enterprises LLC t/a SureShade®
ATF Installation Guide
SKILL LEVEL OF INSTALLER
Must be able to read a tape measure and be comfortable using a hand drill.
• For installation of shade framework - intermediate skill level
-
Read tape measure
-
Use hand drill
-
Able to lift 35+ lbs
• Electrical installation - wiring of shade
Wiring of shade to the boat should be done by an experienced marine electrician.
INSTALLATION TIME FRAME
It is recommended that two people perform the installation. Depending on the type of mount (surface or
integrated) and the complexity of the wire run to the boat’s power source, the installation can take anywhere
from 10 – 16 hours.
Summary of Contents for ATF-SG
Page 2: ......
Page 10: ...GENERAL INFORMATION 6 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 14: ...SAFETY 10 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 16: ...SPECIFICATIONS 12 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 47: ...TROUBLESHOOTING 43 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 48: ...TROUBLESHOOTING 44 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 49: ......