13
© 2018 Rodan Enterprises LLC t/a SureShade®
ATF Installation Guide
PREPARATION
4
PARTS AND QUANTITIES
Many of the provided parts are pre-assembled before shipping. This helps to ensure all necessary parts are
included and checked for proper
ȴ
t before delivery. Ensure all assembled parts are contained in the shipping
crate BEFORE starting installation. (See Figure 1.)
PART
QUANTITY
Shade speci
ȴ
cation drawing
ȃ
speci
ȴ
c to your shade and provided as a separate
document
1
Mounting clamps w/mounting hardware and bolt covers
4
Pre-assembled actuators
2
Roller assembly w/mounting hardware
1
Outer crossbar w/mounting hardware
1
Mid-crossbar w/mounting hardware
1
Pre-rolled canvas (attached to roller assembly)
1
Pre-programmed electronic controller w/wireless remote
1
Starboard and port control harness w/Deutsch connectors
2
Summary of Contents for ATF-SG
Page 2: ......
Page 10: ...GENERAL INFORMATION 6 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 14: ...SAFETY 10 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 16: ...SPECIFICATIONS 12 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 47: ...TROUBLESHOOTING 43 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 48: ...TROUBLESHOOTING 44 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 49: ......