INSTALLATION
25
© 2018 Rodan Enterprises LLC t/a SureShade®
ATF Installation Guide
3. INSTALLING AND SECURING THE ACTUATORS
A. Place the actuators onto the installed mounting clamps.
B. Attach the top mount to the mounting clamps using the provided hardware.
Do not tighten as
forward/aft adjustments may be needed.
C. Measure from the telescoping end of the stationary actuator tube to the aft mounting clamp.
There should be no less than 4 inches between the end of the tube and the aft mounting clamp. (See
Figure 14.)
D. Repeat process for the other actuator.
E. Once both actuators are aligned, tighten the mounting clamp top brackets.
4"
Figure 14 – Measuring Space Between Stationary Tube and Mounting Clamp
Summary of Contents for ATF-SG
Page 2: ......
Page 10: ...GENERAL INFORMATION 6 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 14: ...SAFETY 10 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 16: ...SPECIFICATIONS 12 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 47: ...TROUBLESHOOTING 43 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 48: ...TROUBLESHOOTING 44 2018 Rodan Enterprises LLC t a SureShade ATF Installation Guide...
Page 49: ......