5
10. BRIDGE TRAM PROCEDURE: It is critical to the performance of the feeder
to have the separating wheels level with respect to the nip rollers. To do this,
first loosen the bridge mounting screws (Item 8, Fig. 6-3) on both sides of the
bridge. Turn the separator adjustment CW several turns so that the bridge
can be lowered all the way to the bottom of the slots. Tighten one screw on
each side. Now place a thin strip of paper under each separating wheel (it is
best to cut one piece of paper into two strips to ensure that the strips are the
same thickness). Now turn the separator adjustment CCW until the
separating wheels just contact the nip rollers. Move the paper strips to feel if
the resistance is equal under each separating wheel. If one moves with less
resistance than the other, loosen the screw on the side that is tighter and
raise that side of the bridge slightly and tighten screw. Check the resistance
under each separating wheel with the paper strips again and adjust
accordingly. Once the resistance is equal under each separating wheel
tighten the bridge screws securely. Proceed to step 6 for further setup
instructions. This procedure must be followed whenever the bridge is
adjusted up or down for materials with different thickness. This adjustment is
“very”
critical when feeding thin materials.
Summary of Contents for SE-1200-E
Page 1: ...Sure Feed Engineering Inc SE 1200 EI Operation Parts Manual...
Page 11: ...Sure Feed Engineering Inc 10 SECTION 6 Sure Feed Engineering Inc Parts Manual...
Page 13: ...Sure Feed Engineering Inc 12 FIG 6 1...
Page 16: ...Sure Feed Engineering Inc 15 FIG 6 2...
Page 18: ...Sure Feed Engineering Inc 17 FIG 6 3...
Page 20: ...Sure Feed Engineering Inc 19 FIG 6 4...
Page 22: ...Sure Feed Engineering Inc 21 FIG 6 5...
Page 24: ...Sure Feed Engineering Inc 23 FIG 6 6...
Page 26: ...Sure Feed Engineering Inc 25 FIG 6 7...
Page 28: ...Sure Feed Engineering Inc 27 FIG 6 8...
Page 30: ...Sure Feed Engineering Inc 29 Fig 6 9...
Page 32: ...Sure Feed Engineering Inc 31 FIG 6 10...
Page 34: ...Sure Feed Engineering Inc 33 FIG 6 11...
Page 36: ...Sure Feed Engineering Inc 35 FIG 6 12...