Sure-Feed
Engineering
Inc
3
Sure-Feed Engineering Inc.
Installation Instructions Cont’
12. Position the feeder on the inserter table so that the edge of the leading piece
is between the material guide tabs and the bottom of the front hopper plate.
13. Adjust the sensor so that the piece advances out further and is well within the
gripper jaw opening.
14. With the speed control set to minimum, jog the inserter to remove the piece
staged in the gripper jaw and return the gripper jaw to the furthest inward
position.
15. Turn the speed control up slightly. This should advance the next piece into
the gripper jaw. Adjust the sensor, material guide tabs and position the SE
1200 EI as needed to align the paper path into the gripper jaw.
16. Load the SE 1200 EI with at least a full handful of material and cycle the
inserter.
17. Notice the material path and the presentation to the gripper jaw, as this is
most important as the cycle speed is increased.
18. Cycle the inserter at full production speed adjusting the SE 1200 EI speed so
that the piece being presented to the gripper jaw is there well ahead of the
end of the forward stroke.
Summary of Contents for SE-1200-E
Page 1: ...Sure Feed Engineering Inc SE 1200 EI Operation Parts Manual...
Page 11: ...Sure Feed Engineering Inc 10 SECTION 6 Sure Feed Engineering Inc Parts Manual...
Page 13: ...Sure Feed Engineering Inc 12 FIG 6 1...
Page 16: ...Sure Feed Engineering Inc 15 FIG 6 2...
Page 18: ...Sure Feed Engineering Inc 17 FIG 6 3...
Page 20: ...Sure Feed Engineering Inc 19 FIG 6 4...
Page 22: ...Sure Feed Engineering Inc 21 FIG 6 5...
Page 24: ...Sure Feed Engineering Inc 23 FIG 6 6...
Page 26: ...Sure Feed Engineering Inc 25 FIG 6 7...
Page 28: ...Sure Feed Engineering Inc 27 FIG 6 8...
Page 30: ...Sure Feed Engineering Inc 29 Fig 6 9...
Page 32: ...Sure Feed Engineering Inc 31 FIG 6 10...
Page 34: ...Sure Feed Engineering Inc 33 FIG 6 11...
Page 36: ...Sure Feed Engineering Inc 35 FIG 6 12...