Chapter 2: Server Installation
2-9
2. CD-ROM and floppy disk drives:
A slim CD-ROM and a floppy drive should be preinstalled in your server.
Refer to Chapter 6 if you need to reinstall a CD-ROM and/or floppy disk
drive to the system.
3. Check the SCSI disk drives:
Depending upon your system's configuration, your system may have one
or more drives already installed. If you need to install SCSI drives, please
refer to Chapter 6.
4. Check the airflow:
Airflow is provided by four 8-cm blower fans. The system component
layout was carefully designed to direct sufficient cooling airflow to the
components that generate the most heat. Note that all power and data
cables have been routed in such a way that they do not block the airflow
generated by the fans.
5. Supplying power to the system:
The last thing you must do is to provide input power to the system. Plug
the power cord from the power supply unit into a high-quality power
strip that offers protection from electrical noise and power surges. It is
recommended that you use an uninterruptible power supply (UPS).
Summary of Contents for SUPERSERVER 6023P-8
Page 1: ...SUPERSERVER 6023P 8R SUPERSERVER 6023P 8 USER SMANUAL 1 0 SUPER...
Page 5: ...v Preface Notes...
Page 10: ...SUPERSERVER 6023P 8R 6023P 8 User s Manual x Notes...
Page 26: ...2 10 SUPERSERVER 6023P 8R 6023P 8 Manual Notes...
Page 30: ...SUPERSERVER 6023P 8R 6023P 8 User s Manual 3 4 Notes...
Page 38: ...5 4 SUPERSERVER 6023P 8R 6023P 8 User s Manual Figure 5 2 Heatsink Installation...
Page 96: ...A 6 SUPERSERVER 6023P 8R 6023P 8 Manual Notes...
Page 102: ...B 6 SUPERSERVER 6023P 8R 6023P 8R Manual Notes...