2-6
S
UPER
S
ERVER 5016T-TB User's Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click".
Summary of Contents for SUPERSERVER 5016T-TB
Page 1: ...SUPER USER S MANUAL Revision 1 0a SUPERSERVER 5016T TB...
Page 5: ...v Preface Notes...
Page 10: ...Notes SUPERSERVER 5016T TB User s Manual x...
Page 16: ...1 6 SUPERSERVER 5016T TB User s Manual Notes...
Page 25: ...Chapter 2 Server Installation 2 9 Figure 2 5 Accessing the Inside of the System...
Page 30: ...3 4 SUPERSERVER 5016T TB User s Manual Notes...
Page 62: ...5 28 SUPERSERVER 5016T TB User s Manual Notes...
Page 70: ...6 8 SUPERSERVER 5016T TB User s Manual Notes...