2-8
S
UPER
S
ERVER 1026GT-TF Series User's Manual
Figure 2-5. Installing the Server into a Rack
Installing the Chassis into a Rack (Figure 2-5)
Confi rm that chassis includes the inner rails and rail extensions . Also, confi rm
1.
that the outer rails are installed on the rack.
Line chassis rails with the front of the rack rails.
2.
Slide the chassis rails into the rack rails, keeping the pressure even on both
3.
sides (you may have to depress the locking tabs when inserting). When the
server has been pushed completely into the rack, you should hear the locking
tabs "click".
(Optional) Insert and tightening the thumbscrews that hold the front of the
4.
server to the rack.
Summary of Contents for SuperServer 1026GT-TF
Page 5: ...v Preface Notes...
Page 30: ...3 4 SUPERSERVER 1026GT TF Series User s Manual Notes...
Page 60: ...5 26 SUPERSERVER 1026GT TF Series User s Manual Notes...
Page 98: ...7 30 SUPERSERVER 1026GT TF Series User s Manual Notes...
Page 100: ...A 2 SUPERSERVER 1026GT TF Series User s Manual Notes...
Page 104: ...B 4 SUPERSERVER 1026GT TF Series User s Manual Notes...