2-6
S
UPER
S
ERVER 5025B-4/5025B-T Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next
step is to install the server into the rack. Do this by lining up the rear of the chassis
rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping
the pressure even on both sides (you may have to depress the locking tabs when
inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the
locking tabs "click". Finish by inserting and tightening the thumbscrews that hold
the front of the server to the rack.
Summary of Contents for Supero SUPERSERVER 5025B-4
Page 1: ...USER S MANUAL 1 0 SUPER SUPERSERVER 5025B 4 SUPERSERVER 5025B T...
Page 5: ...v Preface Notes...
Page 23: ...Chapter 2 Server Installation 2 9 Figure 2 5 Accessing the Inside of the System...
Page 28: ...SUPERSERVER 5025M 4 5025M T User s Manual 3 4 Notes...
Page 94: ...A 6 SUPERSERVER 5025B 4 5025B T User s Manual Notes...
Page 100: ...B 6 SUPERSERVER 5025B 4 5025B T User s Manual Notes...
Page 134: ...D 24 SUPERSERVER 5025B 4 5025B T User s Manual Notes...
Page 138: ...E 4 SUPERSERVER 5025B 4 5025B T User s Manual Notes...