6-7
Chapter 6: Rack Installation
Figure 6-4: Installing the Chassis into a Rack
Installing the Chassis into a Rack
1.
Confirm that the inner rails and rail extensions have been attached to the
chassis. Confirm that the outer rails are installed on the rack.
2. Align the end of the inner rail extensions with the front of the out rails.
3. Slide the inner rails into the outer rails, keeping the pressure even on both
sides. It may be necessary to depress the locking tabs when inserting the
inner rails. When the server has been pushed completely into the rack, the
locking tabs will "click" into the locked position.
4. (Optional) Insert and tighten the thumbscrews that hold the front of the server
to the rack.
Inner Rail
Extensions
Inner Rails
Outer Rails
Stability hazard. The rack stabilizing mechanism must be in place, or the
rack must be bolted to the floor before you slide the unit out for servicing.
Failure to stabilize the rack can cause the rack to tip over.
Summary of Contents for SC819 Series
Page 1: ...SC819 Chassis Series SC819TQ R700UB SC819TQ R700WB USER S MANUAL 1 0b SUPER ...
Page 8: ...SC819 Chassis Manual viii Notes ...
Page 32: ...2 20 SC819 Chassis Manual Notes ...
Page 56: ...SC819 Chassis Manual 5 16 Notes ...
Page 70: ...SC819 Chassis Manual B 2 Notes ...
Page 79: ...C 9 Appendix C SAS 815TQ Backplane Specifications Notes ...