SC523 Chassis Manual
6-2
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front
door completely (~25 inches).
Leave approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and ease in servicing.
This product is for installation only in a Restricted Access Location (dedicated equip-
ment rooms, service closets and the like).
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to
the floor with the full weight of the rack resting on them.
In single rack installation, stabilizers should be attached to the rack.
In multiple rack installations, the racks should be coupled together.
Always make sure the rack is stable before extending a component from the
rack.
You should extend only one component at a time - extending two or more si-
multaneously may cause the rack to become unstable.
General Server Precautions
Review the electrical and general safety precautions that came with the com-
ponents you are adding to your chassis.
Determine the placement of each component in the rack
before
you install the
rails.
Install the heaviest server components on the bottom of the rack first, and then
work up.
•
•
•
•
•
•
•
•
•
•
Warnings and Precautions!
!
!